Procedures and Specifications

   Water Service for New
   Residential Developments


   Commercial, Industrial and
   Fire Service


   Current Projects and 
   Long Term Planning



In order to establish a uniform approach to preparing construction documents and constructing water system improvements within it's service area, the District has prepared the Fire_Service.pdf Developer Policies, Procedures and Standards for Water Systems (DPP&S). This document describes the administrative, engineering, material and construction requirements applicable to all extensions to the water distribution system. A copy of the DPP&S may be picked up at the District's office upon payment of $10.00 for reproduction costs. Excerpts from the DPP&S can be downloaded from this web site include:

  • Policy and Procedures
  • Material Specifications
  • Construction Standard Details

The District maintains an AutoCAD map of its distribution system that shows the location and size of water mains in relation to streets, buildings, streams, railroads and other physical features. The entire set of maps is available on CD in pdf format and may be obtained at the District office for a charge of $50.

In addition to the District's mapping effort, the County 911 office maintains a county-wide map that shows the location of fire hydrants. This information is available on the internet at www.berkeleycountycomm.org (select MSAG MAPS). Note that the hydrants shown on the 911 site include "dry" hydrants in rural areas that are served from streams or ponds as well as those located on public water mains.