New Meter Installation Request

THE FOLLOWING ITEMS MUST ALL BE SATISFIED BEFORE A METER WILL BE INSTALLED:
1. The top of the meter pit must be at finished grade and be flush with the surrounding elevation for a
diameter of at least 3 feet.
2. The water service lateral from the meter pit into the building must be installed and equipped with a ¼ turn shut off valve inside the building; or the shut off valve must be located in a structure designed to accommodate and protect such a device. The shut off valve needs to be easily accessible to the property owner.
3. The meter pit, plumbing inside the meter pit and the service line must be free of any damaged
components.
4. The sewer lateral has been installed and inspected or the septic system is approved for operation.

Please allow up to 10 business days for meter(s) to be installed.